<sub id="c1foq"><sup id="c1foq"></sup></sub>
  • <font id="c1foq"><noscript id="c1foq"><label id="c1foq"></label></noscript></font>
      1. <font id="c1foq"><span id="c1foq"></span></font>
                  <code id="c1foq"></code>
                1. Search for the keyword:
                  News
                  Produts
                  Introduction to installation specification of current transformer
                  1 the installation of the current transformer must be firm. The exposed metal part of the transformer shell should be reliably connected.

                  2 The same set of current transformers should be installed in the same direction to ensure that the primary and secondary circuit currents of the current transformers are in the same direction and the nameplate can be easily observed.

                  3. The secondary side of the current transformer is not allowed to open circuit. When only one secondary circuit is used for the secondary double-turn transformer, the other secondary circuit should be reliably short-connected.

                  4 the low voltage current transformer can not be grounded on the two side. Because the conductors, watt-hour meters and transformers used in low-voltage metering devices have the same insulation level, the highest voltage they can withstand is basically the same; in addition, after the secondary windings are grounded, the insulation level of the primary circuit of the whole set of devices to the ground is reduced, which makes the watt-hour meters or transformers with insulation weaknesses easy to be damaged under high voltage (such as induced lightning strikes). Bad. It is better to reduce the damage caused by lightning damage to two sides.
                  Previous:Technical problems easy to appear in transformer test/ Next:How to use the current transformer correctly?
                  Products
                  Measuring current transformer
                  Metering current transformer
                  Protective current transformer
                  Leakage (residual) protection device
                  The zero sequence current transformer
                  Voltage transformer
                  Transmitter
                  Meter
                  common problem
                  How to use the current transformer correctly?
                  Introduction to installation specification of current transformer
                  Technical problems easy to appear in transformer test
                  Case
                  Contact Us

                  Address: No. 555 Shenze Road, Dongxi Industrial Zone, Jinhua, Zhejiang.
                  Zip code: 321017

                  Tel: 0579-82235395 82235362
                  Fax: 0579-82235388
                  Website: www.stayvermont.com

                  E-mail: aokai@okdq.cn

                  中文字幕丝袜第1页_亚洲色婷婷婷婷五月基地_91高清免费国产自产拍不卡_香蕉人人超人人超碰超悠悠
                  <sub id="c1foq"><sup id="c1foq"></sup></sub>
                2. <font id="c1foq"><noscript id="c1foq"><label id="c1foq"></label></noscript></font>
                    1. <font id="c1foq"><span id="c1foq"></span></font>
                                <code id="c1foq"></code>